Smarter Energy Solution

Factory · Commercial

The Packaging

JINKO-PERC 540 Wp @ 1,722 Panels

The Packaging — photo 11 / 6

Project overview

JINKO-PERC 540 Wp @ 1,722 Panels · ABB 100 kW (9 Set) · On-Grid

About this installation

This factory is located in Chachoengsao. In 2023, our team installed a 929.88 kW on-grid solar rooftop system here, using 1722 × JINKO-PERC 540 Wp panels with 9 × ABB 100 kW inverters.

An on-grid system powers the building directly during the day; at night or in cloudy weather the property draws from the grid as usual, with no batteries to maintain.

Factories running day shifts use the most power exactly when the panels produce it, so nearly all of the solar output is used on site.

FactoryCommercialSolar RooftopChachoengsao

Project details

System size
929.88 kW
System type
On-grid
Location
Chachoengsao
Category
Factory
Customer type
Commercial
Year installed
2023

Interested in a similar system?

Tell us about your property and electricity usage. Our engineers will review your site and recommend a system tailored to your needs.

Free consultation

Ready to let the sun pay your bills?

Book a free site survey — our engineers inspect your property, design a system around your real usage, and deliver a transparent ROI estimate at no cost.